Vakil Whispering Woods

Phase 3 Newsletter: May, 2008



Introduction

Vakil Whispering Woods Phase 3 is a BMRDA approved premium residential layout located in Bangalore's IT corridor, Hosur Road. There are plots of sizes 40x60 and 50x80 with Amenities ranging from butter fly parks and Athlete's Areana to a full fledged clubhouse which includes a Gymnasium, community hall and indoor games.

The following newsletter will be regularly updated to track the progress of the Project. If you would like to talk to us about something that concerns you or if you have any queries, then email us at customercare@vakilhousing.com or call +9180-41193293. As always we're there for you.

Construction Activity




Entrance Arch

75% work done. Large and Fast progress has been made in the construction to give  the Whispering Woods Entrance of the layout and Elegant look.







Strom Water Drains

100% work done. Storm Water drains are intended to drain excess rain and ground water from paved streets and sidewalks. Any sudden large rainfall that exceeds the sewage treatment capacity will be allowed to overflow to the storm water drains.







Water Supply & Sanitation

100% work done. The Sanitation & Water supply system will collect the wastewater and will get passed on to the Sewage treatment plant. The Water supply is designed in a way to allow regular or time limited intervals based on the supply.





Electrical Works

98% work done. The total completion of 98% of electrical work involves power management from a single receptacle to the entire facility at whispering woods. At VWW our electrical arrangement includes power distribution design, engineering, processing and equipment installation works moving fast then expectation. The balance 2% is related to connection with the external supply.






Road works - WBM layer 1

100% work done. The road work WBM layer 1 formation is complete 100 %, and soling is perfectly set for all phases at VWW for long lasting roads at the layouts.









Road works - WBM layer 2

100% work done. 










Over Head Tank 1

100% work done. The overhead tank is now ready to take up water throughout phase 3. The image of over head tank shows the interior and exteriors are completely done. And it has been white colored to give an aesthetic look.








Over Head Tank 2

100% work done. The overhead tank is now ready to take up water throughout phase 3. The image of over head tank shows the interior and exteriors are completely done. And it has been white colored to give an aesthetic look.







Sewage Treatment Plant

Close to 90% in March 08.  Between three Sewage Treatment Plants in Phase 3, for 2 of the design work is complete, and for the 2nd one is complete to 90%. The source of Sewer Treatment Plant is to safe and effectively treat the layouts wastewater by the process of removing contaminants from wastewater both runoff and domestic. It includes physical, chemical and biological processes to remove physical, chemical and biological contaminants..





Athletes Arena

60% work done. The works in the Fields & Arena will include the Volley Ball, Basket Ball, Tennis courts, Athletes Track ( Jogging Track ) Childrens Play Area, Cricket Pitch, Outdoor Theater, and you can also view the completed Skating Rink..
.





Compound Wall

95% work done. A strong 7 foot compound wall surrounds the complete layout for safety & security.










Landscape Gardens

40% done. Whispering Woods is surrounded by beautiful landscape gardens and fruit orchards. Of the total work 35% has been completed, and the balance work is under progress set to be completed very soon.





Club House

5% done. The Club House plans have been drawn and finalised, and the work is set to begin shortly.