Vakil Hosur Hills Newsletter

Updated on: April 2008 A Project by Vakil Housing

Introduction

Vakil Hosur Hills is the first gated community set in 28.5 acres, with amenities that are unheard of in Hosur. These include a long jogging track, swimming pool, a cricket pitch, 2 dedicated children s playground, gymnasium, community hall, indoor facilities for carom, table tennis & chess and a reading room-cum-TV lounge.

The following newsletter will be regularly updated to track the progress of the Project. If you would like to talk to us about something that concerns you, email us at customercare@vakilhousing.com or call 41193293. As always we're there for you.

Construction Activity Table


Site Formation

100% work done.
The site formation is 100% complete. The site formation work had started with the expert's team of Engineers & In-house Architects working out the overall plan of the layout and the engineers executing with the precise quality and detail the marking of each individual plot on which the Villa will be built.


Compound Wall

95% work done.
Compound Wall will remain un-changed for this month till the Engineering team will execute the final portion such that the water is able to pass through the compound wall. The Engineering team is also exceptionally busy in supplementary works around the compound wall.


Sanitary and Water supply

100% work done.
The Sanitation system will collect the wastewater and will get passed on to the Sewage treatment plant. The Water supply is designed in a way to allow regular or time limited intervals based on the supply. Necessary care is taken to ensure safe drinking water.


Electrical Work

95% work done.
Now the total completion of 95%. The electrical work involves power management from a single receptacle to the entire facility. Our Electrical arrangement includes power distribution design, engineering, processing and equipment installation works. All these works are moving on at a fast pace.


Overhead tank & Sump Tank

100% work done.
Overhead tank work has completed 100% at VHH project. The Overhead tank acts as storage for the water and is used to purify & distribute the water from a central location. The internal works of overhead tank now 100 % complete & geared to take up pure water at VHH project.


Sewage Treatment Plant

20% work done.
STP at Vhh now completes 20%.The purpose of Sewer Treatment Plant is to safely and effectively treat the layout's wastewater by the process of removing contaminants from wastewater both runoff and domestic. It includes physical, chemical and biological processes to remove physical, chemical and biological contaminants.


Rose and Jasmine Gardens

80% work done.
The gardens at Hosur Hills project now completes 80%. VHH gardens enhance the beauty of the project which looks with lots of fresh flowers & landscape gardens. The gardens are well maintained with the regular inspection made by gardeners. Further work will be carried out as construction works on Villas come to completion.


.